Future BST GIS Metadata

This layer shows potential or planned future routes to extend the BST. This includes routes that do not yet exist but are denoted in official government plans, existing trails that could become part of the BST in the future but are not currently officially designated, and possible routes that the Bonneville Shoreline Trail Committee suggests as possible extensions but are not part of any official plan. Do not consider any of these routes as absolutely final until they are built and officially designated; any of them are subject to ongoing negotiation and modification as we all try to find alignments that can successfully be added to the BST.

Spatial Reference System: WGS 84 UTM Zone 12N. KML and GeoJSON formats use WGS 84 GCS (lat/lon) as required.

Download Formats

Attributes

  • Name: the name of the specific trail line. Some of these are official names, many are not.
  • Segment: the name of the regional BST segment of which this line is a part.
  • Owner: who owns the land through which this line passes. Government agencies are usually named specifically, while private property is just "private." If the line crosses multiple parcels, multiple owners may be listed.
  • Steward: agency responsible for managing the trail. On public lands, this is usually the same as Owner; on private property, it is usually a city or county.
  • Status: current state of the line with regards to BST designation and access:
    • unofficial: the trail exists, appears to be open to the public, but is a social trail not officially accepted or maintained by anyone
    • closed: the trail exists, on an alignment could become part of BST, but is currently clearly closed to public access (e.g., "No Trespassing" signs)
    • nonbst: an official trail in a current system, but not currently designated as part of the BST
    • planned: route shown in a published trail plan (e.g. city trails master plan), but does not currently exist; includes trails currently under construction
    • potential: route that the BST Committee suggests as a possible alignment, but does not currently exist and is not part of any local plan
  • Trail_form: the current appearance of the trail on the ground:
    • single-: narrow singletrack, less than 2ft wide
    • single+: wide singletrack, at least 2ft wide
    • double-: narrow doubletrack, 3-6ft wide (ATV track)
    • double+: wide doubletrack, more than 6ft wide (Side by Side or Jeep)
    • d-road: improved/gravel dirt road, passable to full-size vehicles
    • path: paved pathway, 6-10ft wide
    • sidewalk: sidewalk, along street, less than 6ft wide
    • shoulder: shoulder along paved road with no sidewalk
    • nonexistent: no existing trail along alignment
  • Mainline: 1=this line is expected to be the primary BST route; 0=alternative route
  • Inventory_date: date on which BSTC last visited this segment and GIS data was updated
  • Condition: current quality of the trail:
    • 0: nonexistent
    • 1: impassable
    • 2: needs to be rerouted or rebuilt
    • 3: needs major maintenance (regrading, drainage, etc.)
    • 4: needs minor maintenance (raking, pruning, etc.)
    • 5: perfect condition
  • Condition_notes: description of above quality evaluation
  • Evaluation: General description of this segment for the public
  • Length_mi: Length of the line in miles
  • Plan_Name: Name of any official plan in which this route is suggested
  • Plan_URL: URL of such a plan

The following columns form an index we are developing to rank these lines by how much we should focus short-term attention on getting them added to the BST

  • NeedPriority: Whether this line needs the priority index calculated
  • DemandScore: How much is this segment being demanded by the local community? 0=locals opposed, 2=mild interest, 5=widespread demand
  • ConnectScore: How does this segment connect to current BST? 0=isolated, 3=extends current BST, 5=short gap between long existing BST stretches
  • ProcessScore: How far along is this segment towards designation? 0=no plans, 3=active planning, 5=under construction
  • LandCost: How much will this land cost to acquire trail rights? 0=already public, 3=partial purchase (easement), 5=expensive acquisition
  • PermitCost: How difficult will it be to get permission to build the trail? 0=already approved, 3=significant process required (NEPA), 5=landowner opposed
  • ConstructCost: How much will it cost to actually build the trail? 0=already exists, 3=moderate grading, 5=very difficult terrain
  • PriorityIndex: Trail Priority Index calculated from the above factors (+scores -costs)
Contact the Bonneville Shoreline Trail Committee (BSTC):
bonnevilleshorelinetrail@gmail.com
© Bonneville Shoreline Trail — All Rights Reserved — Privacy Policy
Privacy Policy